MEIHUA ENVIRONMENTAL
Large factory drainage-network desilting
Industrial plant
Site challenge
Multiple branches and complex deposits required work around production.
Our approach
The network was surveyed and cleaned in zones using high-pressure flushing, extraction and flow verification.
Delivery result
Target sections were completed with site records provided.
Tell us about your project
Share the location, site conditions and preferred schedule. We will contact you to confirm the next step.